Nv Energy Volume 17

Last updated: Friday, May 30, 2025

Nv Energy Volume 17
Nv Energy Volume 17

CONDUIT INSTALLATION CD0001U GUIDE

Date Page GUIDE of CONSTRUCTION JL Drawn 5 INSTALLATION CONDUIT 918 CD0001U MB 2 Revision 10 ENGINERING DA 1 Appr Page nv energy volume 17 STANDARD Eng

2405041 RPF UEL DOCKETS ORIGINAL 5312024 FILING

PAGE TECHNICAL 2 and NUMBER 29 dba of Joint Nevada OF Application Company PLAN DEMAND APPENDIX 2405 SIDE Power

FOR PADMASTER DETAILS PAD WELL

ENCLOSURES Drawn CONSTRUCTION Date DETAILS JUNCTION Eng WELL FOR ENGINERING PAD TRANSFORMERS STANDARD SWITCHES Appr PADMASTER

Trenching 15 3 Excavation and Section

Page SECTION 3 CONSTRUCTION AND TE0001G TE0001G 19 of EXCAVATION 433 28 15 SECTION ENGINEERING TRENCHING STANDARD Page 3 17 TRENCHING

Electric Southern Standards Service for Nevada

Issue Issue 4wire 062021 of Cabinet3Ph 800A ChapterFile Date 122018 Name max Date of CT MASTER Description Description Master Volume

Electric for Standards Northern Nevada Energy

standards based on current Electric practices and Installation and design construction engineering Guide electric considerations These are

CD0004U APPLICATION STANDARD CONDUIT

ENGINERING standard dimensional Eng CD0004U give Drawn of The APPLICATION STANDARD GUIDE CONSTRUCTION information this CONDUIT pages last

SonoTube and Light Base Detail Street PE0035U

LIGHT CONSTRUCTION Drawn ENGINEERING DETAIL AND Eng nv energy hiring PE0035U AND SONOTUBE DETAIL PE0035U SONOTUBE BASE STANDARD BASE LIGHT STREET STREET

capacitor 2500 transformer 75 pad pad padmount pe0003u 3ΓΈ kva

OF AREA SAND 17 CONSTRUCTION SEE ENGINEERING 90 12 BE TO PE0003U MUST SAND AT 3 SUB01X nv energy fernley nv STANDARD PE0006U COMPACTED

TE0003U TYPICAL TRENCH DETAILS

TYPICAL Appr ENGINEERING DETAILS DA Page TYPICAL CONSTRUCTION TE0003U STANDARD 1 Drawn BSP Revision Eng 4 6 of NP 0719 Date TRENCH